• +86-13114242117
  • Jiye Building, No. 1211, Fushan East Avenue, Xiaolan Economic and Technological Development Zone, Nanchang City, Jiangxi Province - Inside the factory
News

What key components should be paid attention to in the maintenance of Construction engineering multi-head drilling rig?

Publish Time: 2024-04-01
Construction engineering multi-head drilling rig is an efficient and multi-functional drilling equipment. During long-term use, the maintenance of key components is crucial. The maintenance of these key components is not only related to the normal operation of the drilling rig, but also directly affects construction efficiency and safety.

First of all, drill bit maintenance is the top priority for multi-head drilling rig maintenance. The drill bit is a component that is in direct contact with the rock and soil, and its degree of wear directly affects the drilling effect. Therefore, regular inspection of drill bit wear and timely replacement of severely worn drill bits are the key to ensuring drilling quality and efficiency. At the same time, keeping the drill bit clean and avoiding the adhesion of mud and debris are also important measures to extend the service life of the drill bit.

Secondly, the maintenance of the transmission system cannot be ignored. The transmission system of a multi-head drilling rig includes components such as a motor, a reducer, and a transmission shaft, which work together to drive the drill bit to rotate and feed. Therefore, regular inspection of the lubrication of the transmission system, timely replacement of lubricating oil and cleaning of oil stains to ensure the flexibility and reliability of transmission components are important steps to ensure the normal operation of the drilling rig.

In addition, the maintenance of the hydraulic system is also an important aspect of the maintenance of multi-head drilling rigs. The hydraulic system is responsible for providing power and control to the drilling rig, and its stability and reliability directly affect the performance of the drilling rig. Therefore, regular inspection of the cleanliness and oil level of the hydraulic oil, timely replacement of the hydraulic oil and cleaning of the oil tank to ensure the normal operation of the hydraulic system are the keys to preventing failures and improving construction efficiency.

To sum up, the maintenance of key components of Construction engineering multi-head drilling rig involves many aspects such as drill bit, transmission system and hydraulic system. Only regular maintenance and upkeep can ensure the normal operation and efficient construction of the drilling rig. At the same time, operators should also strictly abide by maintenance procedures to ensure the quality and effectiveness of maintenance work.
×

Contact Us

captcha