• +86-13114242117
  • Jiye Building, No. 1211, Fushan East Avenue, Xiaolan Economic and Technological Development Zone, Nanchang City, Jiangxi Province - Inside the factory
News

What are the advantages of Construction engineering multi-head drilling rig compared with other drilling equipment?

Publish Time: 2024-03-06
Construction engineering multi-head drilling rig has a series of significant advantages compared with other drilling equipment, making it widely used in the field of construction engineering.
First of all, Construction engineering multi-head drilling rig adopts construction technologies such as power lowering and mud reverse circulation slag discharge, which is relatively advanced technology. It is equipped with multiple drill bits and can drill multiple groove sections with elliptical planes at one time, which greatly improves drilling efficiency. In contrast, traditional drilling equipment usually requires drilling multiple holes and changing drill bits, which is time-consuming and labor-intensive.
Secondly, the Construction engineering multi-head drilling rig does not need to squeeze the soil or disturb the surrounding soil during the drilling process. It has little disturbance to the tank wall, the tank wall is smooth, and the dimensions are accurate. This significantly improves project quality and reduces post-processing workload. However, traditional drilling equipment often causes great disturbance to the surrounding soil during the drilling process, which increases the difficulty of the project and the cost of post-processing.
In addition, Construction engineering multi-head drilling rig also has the characteristics of high degree of automation and low labor intensity. It adopts a computer control system, which can realize automatic operation and reduce manual intervention and errors. At the same time, the expansion and connection process of the drill bit has also been automated, reducing manpower investment and auxiliary time, and improving work efficiency.
In addition, Construction engineering multi-head drilling rig is suitable for a variety of geological conditions, including soft clay, sandy soil, and small-grained gravel layers. It can drill under complex geological conditions and solve technical problems through different drill bit configurations and drilling methods. This makes the Construction engineering multi-head drilling rig more widely applicable in construction projects.
Finally, Construction engineering multi-head drilling rig also has the advantage of less environmental pollution. It uses dry or non-circulating mud drilling, and the amount of mud used is only one-tenth to one-twentieth of traditional drilling equipment, which greatly reduces mud emissions and environmental pollution at the construction site.
To sum up, compared with other drilling equipment, Construction engineering multi-head drilling rig has the advantages of high drilling efficiency, good engineering quality, high degree of automation, low labor intensity, strong applicability and low environmental pollution. These advantages make Construction engineering multi-head drilling rig widely used in the field of construction engineering and promote the continuous development and innovation of drilling technology.
×

Contact Us

captcha